2019
DOI: 10.1016/j.jclepro.2019.01.229
|View full text |Cite
|
Sign up to set email alerts
|

Energy meters evolution in smart grids: A review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
112
0
1

Year Published

2019
2019
2021
2021

Publication Types

Select...
5
1
1

Relationship

1
6

Authors

Journals

citations
Cited by 241 publications
(137 citation statements)
references
References 56 publications
1
112
0
1
Order By: Relevance
“…It is also a step towards demand-side management, by introducing dynamic pricing, encouraging more efficient use of the electricity and providing responsive data for balancing electric loads in order to reduce blackouts. Exchange of current meters to SM, in the power system, may also allow the ability to avoid the capital expense of building new power plants by optimizing the usage of the existing resources [12,13].…”
Section: Introductionmentioning
confidence: 99%
“…It is also a step towards demand-side management, by introducing dynamic pricing, encouraging more efficient use of the electricity and providing responsive data for balancing electric loads in order to reduce blackouts. Exchange of current meters to SM, in the power system, may also allow the ability to avoid the capital expense of building new power plants by optimizing the usage of the existing resources [12,13].…”
Section: Introductionmentioning
confidence: 99%
“…To check how the MOTS method works, the values D m = 1, T s = 0.01, P f a = 0.01, S = 10 have been applied in simulation. In the following, three different scenarios are defined for this purpose: 6,9,15,20,25,40,50,80,100] λ (2) = [100, 80,50,40,25,20,15,9,6,3] λ (3) = [15,15,15,15,15,15,15,15,15,15] In the first scenario, the PUs arrival rate vary from 3 APS (in sub-channel with channel number index (CNI) equal to 1 (CNI = 1)) to 100 APS (for CNI = 10). In Figure 11, an effectiveness evaluation of the proposed algorithm MOTS on channels contribution to data transfer in three different scenarios is presented as a histogram.…”
Section: Performance Evaluation Of the Mots Methods For Channel Ratingmentioning
confidence: 99%
“…For this purpose, the parameters of the model described in Section 3 have been initialized as T S = 0.01 s, D m = 1 s, S = 1, and I b = 6, 291, 456 bit. Now, we increase the arrival rate from 2 arrivals per second (APC) to 40 APC (λ i = [2,5,10,20,40]). Figure 8 shows the NSSI in terms of the arrival rate while Figure 9 depicts the length of the packet.…”
Section: Simulation Of the Proposed Jopss Modelmentioning
confidence: 99%
See 2 more Smart Citations