Icte 2011 2011
DOI: 10.1061/41184(419)486
|View full text |Cite
|
Sign up to set email alerts
|

Energy-Efficient Train Operation with Given Time

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 1 publication
0
0
0
Order By: Relevance
“…Equation (12) shows that the start time of elevator j in round 1 is the loading in time of the passengers to all elevators, while Equation (13) shows that the finish time of elevator j in round 1 is the start time of round 1 plus the total loading time of all floors that the elevator stops at, plus the transportation time from floor l to floor M jk . Equation (14) shows that the start time of elevator j in round k is the finish time of elevator j in round k − 1 plus transportation time from M j,k−1 to floor l, plus the loading time of passengers in round k. Equation (15) shows that the finish time of elevator j in round k is the start time of round k plus the total loading time of all floors that the elevator stops at, plus the transportation time from floor l to floor M jk . Equation (16) shows that all elevators must finish moving in the last round within the limited operating time.…”
Section: N Jkmentioning
confidence: 99%
See 1 more Smart Citation
“…Equation (12) shows that the start time of elevator j in round 1 is the loading in time of the passengers to all elevators, while Equation (13) shows that the finish time of elevator j in round 1 is the start time of round 1 plus the total loading time of all floors that the elevator stops at, plus the transportation time from floor l to floor M jk . Equation (14) shows that the start time of elevator j in round k is the finish time of elevator j in round k − 1 plus transportation time from M j,k−1 to floor l, plus the loading time of passengers in round k. Equation (15) shows that the finish time of elevator j in round k is the start time of round k plus the total loading time of all floors that the elevator stops at, plus the transportation time from floor l to floor M jk . Equation (16) shows that all elevators must finish moving in the last round within the limited operating time.…”
Section: N Jkmentioning
confidence: 99%
“…In addition, the stopping pattern of the elevator can significantly impact its energy consumption. A lift that stops on every floor will consume more energy than one that only stops on every other floor [14]. Therefore, optimizing the stopping pattern of the elevator can lead to significant energy savings.…”
Section: Introduction 1backgroundmentioning
confidence: 99%