2011
DOI: 10.1016/j.rser.2011.02.035
|View full text |Cite
|
Sign up to set email alerts
|

Energy efficiency assessment by process heating assessment and survey tool (PHAST) and feasibility analysis of waste heat recovery in the reheat furnace at a steel company

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
18
0
1

Year Published

2014
2014
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 39 publications
(19 citation statements)
references
References 11 publications
0
18
0
1
Order By: Relevance
“…The main impacts on scheduling parameters include: 1 Permissible charging temperature is different for various materials; 2 Initial forging temperature is different for various materials; 3 Maximum permissible temperature of the heating furnace is different according to the initial forging temperature; 4 The time of heating to the initial forging temperature is different for various materials; 5 The minimum and maximum heating preservation time is different for various materials.…”
Section: Characteristics Of Furnace Chargingmentioning
confidence: 99%
See 2 more Smart Citations
“…The main impacts on scheduling parameters include: 1 Permissible charging temperature is different for various materials; 2 Initial forging temperature is different for various materials; 3 Maximum permissible temperature of the heating furnace is different according to the initial forging temperature; 4 The time of heating to the initial forging temperature is different for various materials; 5 The minimum and maximum heating preservation time is different for various materials.…”
Section: Characteristics Of Furnace Chargingmentioning
confidence: 99%
“…Generally, the shape of billets are round steel or square steel, and the main influence on scheduling parameters are as follows: 1 The permissible charging temperature and maximum heating preservation time are the same when the diameter (d) of round steel equals to side length (l) of the square steel section; 2 The heating time of billets is irrelevant to its length, only to the diameter or side length; 3 There are longer heating times if the billets have larger sizes under the same shape.…”
Section: Characteristics Of Furnace Chargingmentioning
confidence: 99%
See 1 more Smart Citation
“…Besides, Ren and Wang (2011) investigate the development status of iron and steel industry in Shandong province in response to the energy-saving and emission-reduction policy in China, and propose four measures--improving the technical equipment and equipment capacity, optimizing process, decreasing iron-steel ratio and optimizing energy structure--to realize the target of sustainable and low-carbon economic development in Shandong's iron and steel industry. Si et al (2011) analysis the feasibility of waste heat recovery and assesses energy efficiency at a steel company, Gerdau Ameristeel in Selkirk, Manitoba.…”
Section: Iron and Steel Industrymentioning
confidence: 99%
“…Si ve ark. [8] yaptıkları çalışmada Kanada, Manitoba'da bulunan bir çelik fabrikasının enerji verimliliğini değerlendirmiş ve atık ısı geri kazanımının olabilirliğini analiz etmişlerdir. Proses ısıtma değerlendirmesi ve gözden geçirme aracı (PHAST) ile yapılan çalışmada tav fırını verimi %60 olarak hesaplanmıştır.…”
Section: Gi̇ri̇ş (Introduction)unclassified