2021
DOI: 10.15488/11126
|View full text |Cite
|
Sign up to set email alerts
|

Energy Costs in Production Planning and Control: A Categorical Literature Review and Comparative Analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 27 publications
0
1
0
Order By: Relevance
“…The starting point for the determination of the required volumes are the quantities to be produced, which are allocated over a certain time horizon by production planning, taking lot sizing and throughput scheduling into account. In production control, the sequence of production orders is then formed after order release, which also has an influence on the energy demand [64]. The required process times of the individual process These life cycle-specific mechanisms have a particular influence on the material demand in a factory (see Figure 12), which consists of the demand for spare parts, operating materials, tools, scrap and waste.…”
Section: Process Facilitiesmentioning
confidence: 99%
“…The starting point for the determination of the required volumes are the quantities to be produced, which are allocated over a certain time horizon by production planning, taking lot sizing and throughput scheduling into account. In production control, the sequence of production orders is then formed after order release, which also has an influence on the energy demand [64]. The required process times of the individual process These life cycle-specific mechanisms have a particular influence on the material demand in a factory (see Figure 12), which consists of the demand for spare parts, operating materials, tools, scrap and waste.…”
Section: Process Facilitiesmentioning
confidence: 99%