Record of Conference Papers Industry Applications Society 52nd Annual Petroleum and Chemical Industry Conference
DOI: 10.1109/pcicon.2005.1524572
|View full text |Cite
|
Sign up to set email alerts
|

Electrical Safety, Arc Flash Hazards, and "The Standards" A Comprehensive Overview

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 3 publications
0
3
0
Order By: Relevance
“…An indepth report that includes an assessment of how groups and organizations are addressing arc flash hazards in LVMCCs is included in [5] and [6] (see also Part B of Table I). Although each of these groups is contributing to the further understanding of enhancing the safety of the LVMCC, the topic of establishing arc resistant requirements to contain internal arcing faults has yet to be addressed.…”
Section: A Overview Of Testing Guides That Address Arc Flashmentioning
confidence: 99%
“…An indepth report that includes an assessment of how groups and organizations are addressing arc flash hazards in LVMCCs is included in [5] and [6] (see also Part B of Table I). Although each of these groups is contributing to the further understanding of enhancing the safety of the LVMCC, the topic of establishing arc resistant requirements to contain internal arcing faults has yet to be addressed.…”
Section: A Overview Of Testing Guides That Address Arc Flashmentioning
confidence: 99%
“…An indepth report that includes an assessment of how groups and organizations are addressing arc flash hazards in LVMCCs is included in [5] and [6] (see also Table I, Part B). Although each of these groups is contributing to the further understanding of enhancing the safety of the LVMCC, the topic of establishing arc resistant requirements to contain internal arcing faults has yet to be addressed.…”
Section: A Overview Of Testing Guides That Address Arc Flashmentioning
confidence: 99%
“…The arc-related issues like incident energy, arc flash boundary are calculated once the substation is in operation as power system protection does not require considering the arcrelated issues; instead, it considers the protection issues only. Therefore, very few papers give a little insight into the arcrelated issue [18,19] independently. Unfortunately, those findings are for the low voltage (LV) (~600V and below) system design.…”
Section: Introductionmentioning
confidence: 99%