Abstract:The Port of Durban (PoD) is currently upgrading its existing power supply to a supply voltage of 132 kV. The existing 33 kV supply cables are old and have exceeded their designed life resulting in unplanned power outages. The existing 33 kV switchgear is old and obsolete as a result it is difficult to maintain. The existing maximum demand capacity will not be able to cater for the additional loads required for the planned expansion developments.The electrical load flow is a very important and fundamental tool … Show more
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.