2019
DOI: 10.1080/15325008.2019.1627609
|View full text |Cite
|
Sign up to set email alerts
|

Electric Vehicle Charging and Batteries Swapping Management Strategy with Photovoltaic Generation in Business Districts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 30 publications
0
1
0
Order By: Relevance
“…At present, only four universities, such as Iowa State University, have developed their own real‐time hybrid simulation platform schemes, which are mainly used for the related applications of micro‐networks and low/medium voltage distribution networks, as well as the related analysis of power communication network attacks. The world's first power grid small step real‐time simulator has been developed by the CEPRI [51]. It can support adaptive variable‐step simulation requirements of at least 10 microseconds.…”
Section: Key Technologies Of Cyber‐physical Power Systems Simulationmentioning
confidence: 99%
“…At present, only four universities, such as Iowa State University, have developed their own real‐time hybrid simulation platform schemes, which are mainly used for the related applications of micro‐networks and low/medium voltage distribution networks, as well as the related analysis of power communication network attacks. The world's first power grid small step real‐time simulator has been developed by the CEPRI [51]. It can support adaptive variable‐step simulation requirements of at least 10 microseconds.…”
Section: Key Technologies Of Cyber‐physical Power Systems Simulationmentioning
confidence: 99%
“…In [32][33][34][35], a BS station was considered as a battery aggregator in an area and significantly improved the local consumption of RPG. In [36][37][38], BS and G2V modes were coordinated satisfied EV users' requirements and maintained the normal operation of the power grid. A BS station with lots of batteries is considered as a flexible resource with sufficient capacity.…”
Section: Introductionmentioning
confidence: 99%