2020
DOI: 10.1080/09720529.2020.1721886
|View full text |Cite
|
Sign up to set email alerts
|

Efficiency measurement of data centers: An elucidative review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
1
1
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…The entire provision power is somewhat, which is the high voltage power that is transmitted to the data centre to make functioning of the IT and cooling components. Additional power supply modules like illumination and workplace area for data centre controllers are not regarded for those are customarily small in comparison with power pull of the IT component, switchgear, UPS chillers, cooling tower, air conditioners, liquid conditioners and some more power or cooling components [13]. We can interpret IT component power in such a way that the real line cable power which we draw from each of the IT components within the data centre.…”
Section: Power Usage Effectiveness (Pue)mentioning
confidence: 99%
See 1 more Smart Citation
“…The entire provision power is somewhat, which is the high voltage power that is transmitted to the data centre to make functioning of the IT and cooling components. Additional power supply modules like illumination and workplace area for data centre controllers are not regarded for those are customarily small in comparison with power pull of the IT component, switchgear, UPS chillers, cooling tower, air conditioners, liquid conditioners and some more power or cooling components [13]. We can interpret IT component power in such a way that the real line cable power which we draw from each of the IT components within the data centre.…”
Section: Power Usage Effectiveness (Pue)mentioning
confidence: 99%
“…When the value shows a number more than 1, it signifies that now a data centre overhead is needed to assist the IT volume. The correlative of PUE, which is named data centre efficiency (DCE), may be regarded too like a substitute picture for a point of reference [13].…”
Section: Power Usage Effectiveness (Pue)mentioning
confidence: 99%