2017 10th International Symposium on Advanced Topics in Electrical Engineering (ATEE) 2017
DOI: 10.1109/atee.2017.7905152
|View full text |Cite
|
Sign up to set email alerts
|

Efficiency assessment of an urban area grid connected PV power plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…ICPE-CA PV power plant is consisted of two photovoltaic systems, namely: the photovoltaic system A with a 14 kWp installed power corresponding to a number of 56 modules, 250 W each, and the photovoltaic system B with 3.84 kWp installed power corresponding to 16 modules, 240 W each [6][7].…”
Section: Methodsmentioning
confidence: 99%
“…ICPE-CA PV power plant is consisted of two photovoltaic systems, namely: the photovoltaic system A with a 14 kWp installed power corresponding to a number of 56 modules, 250 W each, and the photovoltaic system B with 3.84 kWp installed power corresponding to 16 modules, 240 W each [6][7].…”
Section: Methodsmentioning
confidence: 99%