1971
DOI: 10.3133/ofr71234
|View full text |Cite
|
Sign up to set email alerts
|

Effects of roadway and pond construction on sediment yield near Harrisburg, Pennsylvania

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

1977
1977
2021
2021

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…They increased to 15 mg/L from August 1, 1970, to February 28, 1971, because of the construction of a 5-acre (2-ha) farm pond and a one-lane roadway. The effect of this pond construction is not shown in table 5; however, it was discussed in detail in earlier reports (Reed, 1971(Reed, , 1976. The concentration decreased to 5 mg/ L from March 1,1971, to October 31,1972, the start of highway construction.…”
Section: Daily-mean Suspended-sediment Concentrationsmentioning
confidence: 92%
See 1 more Smart Citation
“…They increased to 15 mg/L from August 1, 1970, to February 28, 1971, because of the construction of a 5-acre (2-ha) farm pond and a one-lane roadway. The effect of this pond construction is not shown in table 5; however, it was discussed in detail in earlier reports (Reed, 1971(Reed, , 1976. The concentration decreased to 5 mg/ L from March 1,1971, to October 31,1972, the start of highway construction.…”
Section: Daily-mean Suspended-sediment Concentrationsmentioning
confidence: 92%
“…The cumulative turbidity load discharged by the stream draining basin 2 was 680 NTU for the 5-year period. The largest monthly turbidity load (Reed, 1971(Reed, , 1976. If the effects of the hurricane and the pond-roadway construction are removed, the turbidity load from basin 2 averaged 40 NTU per year, or 3 NTU per month during the period before construction of Interstate 81 began.…”
Section: Turbidity Loadmentioning
confidence: 99%
“…They occurred during April and July 1970 and February 1971 and were 29,23, and 40 NTU, respectively. The high values for July 1970 and February 1971 were partially the result of the construction of a 5-acre (2 ha) farm pond and a single lane roadway discussed in earlier reports(Reed, 1971(Reed, , 1976. If the effects of the hurricane and the pond-roadway construction are removed, the turbidity load from basin 2 averaged 40 NTU per year, or 3 NTU per month during the period before construction of Interstate 81 began.During the 23-month period(November 1, 1972, to September 30, 1974) of construction of Interstate 81 the turbidity load discharged by the stream…”
mentioning
confidence: 86%
“…The CO 2 corrosion of carbon steel and the protectiveness of its corrosion product (siderite) have been extensively investigated in mostly diluted NaCl solutions [1 8]. Only few studies have focused on the effect of Ca 2+ ions, despite them being present in brines from many geological formations [9,10]. Ca 2+ can react with CO 2 and precipitate as calcite (CaCO 3 ), when the solubility limit of CaCO 3 is exceeded [11,12].…”
Section: Introductionmentioning
confidence: 99%