2015
DOI: 10.17265/1537-1506/2015.12.002
|View full text |Cite
|
Sign up to set email alerts
|

Effects of Internal Control System Deficiency on Contractors’ Infrastructural Development Capability in the Nigerian Public Sector

Abstract: Public-private-partnership-initiative, such as build-operate and transfer method of contracting, should be encouraged to improve on contractors' capability and stewardship.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…Specifically, efficient transportation and communication should be available, people should enjoy basic healthcare delivery with minimal effort and there should be food security; but, ironically, this is not the case. The problem is that the economic growth recorded has not translated into improved welfare as expected in some nations (Babatunde, 2015;Mitchell, 2005). This problem is of concern to this study because the trend has to be reversed.…”
Section: Statement Of the Problemmentioning
confidence: 99%
“…Specifically, efficient transportation and communication should be available, people should enjoy basic healthcare delivery with minimal effort and there should be food security; but, ironically, this is not the case. The problem is that the economic growth recorded has not translated into improved welfare as expected in some nations (Babatunde, 2015;Mitchell, 2005). This problem is of concern to this study because the trend has to be reversed.…”
Section: Statement Of the Problemmentioning
confidence: 99%