1995
DOI: 10.1016/0098-1354(95)87095-4
|View full text |Cite
|
Sign up to set email alerts
|

Effects of equipment failure uncertainty in batch production scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

1998
1998
2016
2016

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 16 publications
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…Note that the results of the above optimal planning policy (obtained from the solution of problem P2) should be validated at the scheduling level (see, for example, refs and ). In that sense, the output of the planning model, such as the number and timings of the preventive maintenance tasks, can be incorporated into a detailed process/maintenance scheduling framework.…”
Section: Simultaneous Design Production and Maintenance Planningmentioning
confidence: 99%
See 1 more Smart Citation
“…Note that the results of the above optimal planning policy (obtained from the solution of problem P2) should be validated at the scheduling level (see, for example, refs and ). In that sense, the output of the planning model, such as the number and timings of the preventive maintenance tasks, can be incorporated into a detailed process/maintenance scheduling framework.…”
Section: Simultaneous Design Production and Maintenance Planningmentioning
confidence: 99%
“…The importance of considering reliability and maintenance criteria in process manufacturing, design, and operation has been recognized over the past 15 years (see, for example, refs 2-11). Most of the previous work focused on continuous processes, with only a few works specifically concerned with multipurpose operation (for example, refs [12][13][14][15][16]. A common theme that is emerging from previous work is the need for the introduction of consistent and rigorous system effectiveness criteria (for example, refs 10, 17, and 18) to characterize the performance of a process system from both the availability and the productivity points of view.…”
Section: Introductionmentioning
confidence: 99%