2022
DOI: 10.1007/978-981-16-5839-6_43
|View full text |Cite
|
Sign up to set email alerts
|

Effective Ways to Handle the Change Management for Cost in Various Types of Contracts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 18 publications
0
0
0
Order By: Relevance
“…Changing the construction contract due to the increase in the amount of work leads to cost overruns or an extension of the construction schedule [12]. Numerous studies have been carried out that have looked at how changes to construction works affect projects, and the results show that many construction projects around the world face problems with contract changes due to delays in the construction schedule and cost increases [13]. In the construction sector, changes in contract terms can occur at any point in the project life cycle [14].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Changing the construction contract due to the increase in the amount of work leads to cost overruns or an extension of the construction schedule [12]. Numerous studies have been carried out that have looked at how changes to construction works affect projects, and the results show that many construction projects around the world face problems with contract changes due to delays in the construction schedule and cost increases [13]. In the construction sector, changes in contract terms can occur at any point in the project life cycle [14].…”
Section: Literature Reviewmentioning
confidence: 99%