2020
DOI: 10.1007/s10706-020-01563-4
|View full text |Cite
|
Sign up to set email alerts
|

Effect of the Blocking Water and Limiting Discharge and Surrounding Rock Permeability on the Stability of Subsea Tunnel

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…e vibration generated by train operation propagates through the tunnel and surrounding soil and has an impact on the environment. Under the action of long-term train vibration load, the waterproof effect and durability of the railway tunnel structure will be significantly affected, and it will also affect the track's performance, ride comfort, passenger comfort, and normal train operations [8,9]. e model of the grade-crossing tunnel is shown in Figure 1.…”
Section: Dynamic Responsementioning
confidence: 99%
“…e vibration generated by train operation propagates through the tunnel and surrounding soil and has an impact on the environment. Under the action of long-term train vibration load, the waterproof effect and durability of the railway tunnel structure will be significantly affected, and it will also affect the track's performance, ride comfort, passenger comfort, and normal train operations [8,9]. e model of the grade-crossing tunnel is shown in Figure 1.…”
Section: Dynamic Responsementioning
confidence: 99%
“…In this method, grout is used to replace the water existing in cracks and pores, block the path of the groundwater, restrict the migration of the groundwater, and form rock and soil with certain impermeability to ensure the stability of the surrounding environment of the tunnel. Grouting waterproofing does not mean that the added solid is dripping impervious through grouting, but more emphasis is placed on reducing the adverse impact of water on the construction and the structure through grouting [32,33]. e grouting scheme adopted for the Gongbei tunnel is as follows: the grouting holes were reserved on the steel pipes of the pipe roof, the grouting holes were arranged according to the principle of curtain grouting, and the grouting was conducted in each steel pipe.…”
Section: Grouting Ringmentioning
confidence: 99%