2014
DOI: 10.1061/(asce)st.1943-541x.0001015
|View full text |Cite
|
Sign up to set email alerts
|

Effect of Predamage on the Stress-Strain Relationship of Confined Concrete under Monotonic Loading

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

11
103
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 87 publications
(118 citation statements)
references
References 23 publications
11
103
0
Order By: Relevance
“…It approaches a constant when ε un is greater than 0.02. A similar trend was reported by Wu et al [17].…”
Section: Reloading Elastic Modulus E Resupporting
confidence: 82%
See 2 more Smart Citations
“…It approaches a constant when ε un is greater than 0.02. A similar trend was reported by Wu et al [17].…”
Section: Reloading Elastic Modulus E Resupporting
confidence: 82%
“…The extensive study by Wu et al [17] of the stress-strain relationship of FRP repaired concrete has shown that confinement does affect its initial elastic modulus, particularly for concrete with higher damage (larger ε un ) and larger confinement. On the other hand, the residual plastic strain significantly affects E re , and based on Eq.…”
Section: Reloading Elastic Modulus E Rementioning
confidence: 98%
See 1 more Smart Citation
“…Unexpected large scatter was observed in the relationships of strain versus damaged degree indicating the effect of damaged degree in strain is comparatively negligible. This finding was similar with those reported by Wu et al in the investigation of repaired concrete using CFRP jacketing [2]. However, no detail explanation was given in their report.…”
Section: Pre-damaged Effects On Confined Hsc Columnssupporting
confidence: 82%
“…When a concrete structure was damaged due to major events such as earthquakes, blast or impact, its integrity has been compromised and it can collapse anytime if no immediate actions were taken to restore its capacity [1][2][3][4][5][6]. An engineer can choose to either replace the affected structure members with new members, demolish the structure for rebuild or emergency repair.…”
Section: Introductionmentioning
confidence: 99%