2021
DOI: 10.1007/s10706-021-01917-6
|View full text |Cite
|
Sign up to set email alerts
|

Effect of Face Length in Initial Mining Stage of Fully Mechanized Top-Coal Caving Face with Large Mining Height

Abstract: Based on the eld measurement of the end resistance of the support during the initial weighting of the basic roof and the macroscopic mine pressure behavior during the weighting period of 101,22211,103 and 301 fully mechanized caving face in Changchun Xing Coal Mine, the mine pressure law of the working face is summarized and compared, and the relationship between the working face length and the working resistance of the support ( the weighting strength ) and the macroscopic mine pressure behavior is obtained. … Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 13 publications
(8 reference statements)
0
1
0
Order By: Relevance
“…Taking an excavation roadway of 5000m as an example, at least 5 shifts are required. Due to the large number of underground shifting equipment, large volume and self-weight weight of coal mines, trackless auxiliary transportation equipment or winches are used in the moving process, which has a large workload, high intensity and long time [10][11][12][13], which seriously affects the work efficiency of efficient and rapid boring equipment.…”
Section: Analysis Of the Power Supply Status Of Efficient And Fast Bo...mentioning
confidence: 99%
“…Taking an excavation roadway of 5000m as an example, at least 5 shifts are required. Due to the large number of underground shifting equipment, large volume and self-weight weight of coal mines, trackless auxiliary transportation equipment or winches are used in the moving process, which has a large workload, high intensity and long time [10][11][12][13], which seriously affects the work efficiency of efficient and rapid boring equipment.…”
Section: Analysis Of the Power Supply Status Of Efficient And Fast Bo...mentioning
confidence: 99%