“…The following factors are identified when evaluating the connectivity and connection quality of transport relations [12][13][14][15][16][17][18]: -number of connections N s , -average waiting time of the passenger, -distance of the L i , -type of train and number of trains, -transportation time T pi , -number of transfers N pi , -transfer time T wi , -time to reach the destination T Di , -speed of transportation V Pi , -speed of reaching the destination V Di .…”