Effect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact, and Strategies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
59
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 66 publications
(62 citation statements)
references
References 41 publications
0
59
0
Order By: Relevance
“…The top five critical wastes are discussed. Reworks/abortive works (W03) obtained the highest criticality (mean = 3.60) to productivity performance, indicating that building projects in Singapore suffered from numerous abortive works [40]. This result echoed the post-survey interviewees who reported that abortive works occurred throughout the construction phase and influenced many trades on site.…”
Section: Resulting Wastesmentioning
confidence: 64%
See 1 more Smart Citation
“…The top five critical wastes are discussed. Reworks/abortive works (W03) obtained the highest criticality (mean = 3.60) to productivity performance, indicating that building projects in Singapore suffered from numerous abortive works [40]. This result echoed the post-survey interviewees who reported that abortive works occurred throughout the construction phase and influenced many trades on site.…”
Section: Resulting Wastesmentioning
confidence: 64%
“…These RFIs would occur earlier and informally before the field staff worked with an imperfect plan. This means fewer conflicts and less confusion during construction, improving productivity [40].…”
Section: Resulting Wastes Of Nva Activitiesmentioning
confidence: 99%
“…Regarding research conducted in Singapore, Oo [22] identified critical cultural and individual factors for the architectural firms in Singapore to move from the traditional work practices, but did not identify the factors motivating collaborative relationships among the primary participants. Hwang et al [23] found that BIM implementation had a significant impact on reducing reworks arising from various changes and errors/omissions in building projects in Singapore, but did not indicate how to promote BIM diffusion. Moreover, little was known about how the driving factors may influence different organizations' BIM implementation.…”
Section: Literature Reviewmentioning
confidence: 98%
“…Thus, the sample had a good balance of stakeholders and represented major BIM implementers in Singapore. To gain an in-depth understanding of the factors' influence on different types of firms, face-to-face interviews were conducted with industry experts [23,54]. This mixed method reduced the bias originating from a single source of data and facilitated a comprehensive understanding of the factors [55].…”
Section: Code Drivers For Bim Implementationmentioning
confidence: 99%
“…The efficient combination of BIM and the design phase can help designers achieve multiple goals. In the design phase, BIM can effectively avoid rework problems caused by design errors and improve the delivery rate of the project [19]. At the same time, BIM can also be used as a collaborative design platform for information sharing to solve the interoperability of design software data of different disciplines problem for achieving real collaborative design [20].…”
mentioning
confidence: 99%