1988
DOI: 10.2307/1058857
|View full text |Cite
|
Sign up to set email alerts
|

Economies of Scale in Nuclear Power Generation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
18
0

Year Published

1990
1990
2020
2020

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 40 publications
(20 citation statements)
references
References 16 publications
2
18
0
Order By: Relevance
“…The negative labor and maintenance elasticity of capital demand indicates that capital and labor are complements, but the results are insignificant due to the large standard error. These results are consistent with those of Krautmann and Solow (1988). The estimate for the own-price elasticity of capital is -2.102, which is also very close to their estimate of -2.334.…”
Section: Resultssupporting
confidence: 90%
See 1 more Smart Citation
“…The negative labor and maintenance elasticity of capital demand indicates that capital and labor are complements, but the results are insignificant due to the large standard error. These results are consistent with those of Krautmann and Solow (1988). The estimate for the own-price elasticity of capital is -2.102, which is also very close to their estimate of -2.334.…”
Section: Resultssupporting
confidence: 90%
“…These studies used data on the generation source, which represents the dominant part of the U.S. electricity supply industry. However, the number of previously published studies on the cost structures and scale economies of nuclear power generation is relatively small and not recent [e.g., Krautmann and Solow (1988), Marshall and Navarro (1991), Canterbery, Johnson, and Reading (1996)]. …”
Section: Introductionmentioning
confidence: 99%
“…These include factors such as regional labour costs or whether sites at different latitudes require different amounts of construction to be done indoors [17,[37][38][39][40][41].…”
Section: Shipments (Thousands)mentioning
confidence: 99%
“…Zimmerman (1982), Krautmann and Solow (1988), Cantor and Hewlett (1988) and McCabe (1996) found that the construction of larger reactors 8 increased the cost per MW installed. According to Cantor and Hewlett (1988), bigger units increase project complexity, subjecting them to managerial problems and stricter regulatory scrutiny.…”
Section: Construction Cost Escalation: Data and Modelmentioning
confidence: 99%