1998
DOI: 10.1007/978-0-387-35321-0_18
|View full text |Cite
|
Sign up to set email alerts
|

Economical Analysis of High Volume Flexible Manufacturing System for Agile Manufacturing

Abstract: We focus on the economical aspect of a high-volume flexible manufacturing system (HV-FMS) for agile manufacturing. We develop a model to estimate the economical behavior of HV-FMS and flexible transfer line. Under several demand patterns which have been generated from historical data, both models are simulated to evaluate the effectiveness ofHV-FMS from an economical view point.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2002
2002
2003
2003

Publication Types

Select...
1
1
1

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 1 publication
0
5
0
Order By: Relevance
“…The bid types used for the auction to select the MC have the significant influence to the resulting tool set allocation. The auction bid set BP [1,2], based on the distance from the pallet changing station to the MC, can characterize each MC to process a specific OP forming a material flow from left to right. The auction bid set BP [l,3], based on the ratio of frequency of processed product kinds at an MC, can characterize each MC to process a specific product kind enabling MCs to be grouped by the product kind.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…The bid types used for the auction to select the MC have the significant influence to the resulting tool set allocation. The auction bid set BP [1,2], based on the distance from the pallet changing station to the MC, can characterize each MC to process a specific OP forming a material flow from left to right. The auction bid set BP [l,3], based on the ratio of frequency of processed product kinds at an MC, can characterize each MC to process a specific product kind enabling MCs to be grouped by the product kind.…”
Section: Discussionmentioning
confidence: 99%
“…The prespecified parameters for the characterization algorithms are 30,000 work pieces and 480hours. Figure 6 shows the change in the make-span when the tool sets are reduced from 570 by CA-a using BP [1,2]. As shown in the Figure, the make-span to manufacture 30,000 pieces does not exceed the prespecified 480 working hours until the tool sets are reduced to 79 in this case.…”
Section: Simulation Studymentioning
confidence: 95%
See 1 more Smart Citation
“…In this study, we process three kinds of cylinder heads (A, B, C) with a product mix (45%, 20%, 35%). We investigated the robustness for the machine failure in a previous study (Fujii et al, 1998b), and then in this paper, we focus on the energy-saving effect.…”
Section: Case Study Of Cylinder-head Manufacturingmentioning
confidence: 99%
“…Since most of the products processed by FMS, FTL or HV-FMS are similar kinds with different sizes and different topologies for processing, e.g., differences in number, size and/or position of holes, the processing operations of products can be divided into some groups mostly based on the processability on one cell without changing the orientation of the work on a pallet. HV-FMS having a serial-parallel layout of machining cells is proposed taking this nature into consideration (Fujii, et al 1998a(Fujii, et al , 1998b(Fujii, et al , 2000. Parallel MCs in HV-FMS have the same tools and machining programs for processing of a prespecified operation group and can process the operations of any work.…”
Section: Introductionmentioning
confidence: 99%