2011
DOI: 10.6106/kjcem.2011.12.1.33
|View full text |Cite
|
Sign up to set email alerts
|

Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The research on the in-situ production of PC members [32][33][34] has mainly focused on the production area, with no study on the storage yard layout risk management. A review of the research on yards at construction sites showed that there has been no study on yards for the in-situ production of PC members [35][36][37][38][39], using manufacturing theory for the proper inventory management at construction sites. Therefore, the purpose of this study was to conduct a basic risk analysis of storage yard layout management for in-situ PC production.…”
Section: Introductionmentioning
confidence: 99%
“…The research on the in-situ production of PC members [32][33][34] has mainly focused on the production area, with no study on the storage yard layout risk management. A review of the research on yards at construction sites showed that there has been no study on yards for the in-situ production of PC members [35][36][37][38][39], using manufacturing theory for the proper inventory management at construction sites. Therefore, the purpose of this study was to conduct a basic risk analysis of storage yard layout management for in-situ PC production.…”
Section: Introductionmentioning
confidence: 99%