2023
DOI: 10.5897/jetr2022.0737
|View full text |Cite
|
Sign up to set email alerts
|

Economic impacts of optimizing energy recovery in clinker cooler using clinker cooler bed as a case study

Abstract: This paper tends to analyze one critical area "pyro system" in cement production process where energy is been lose and ways on how some of these energies can be recovered back into the system and also analyzing the cost benefits. This led to the modeling of a clinker cooler known as "test rig". This model was used to study the operating system of the existing running plant. The test rig was designed using SolidWorks Computer Aided Design software based on the geometrical dimensions adopted into the test rig de… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 16 publications
(31 reference statements)
0
0
0
Order By: Relevance