2013
DOI: 10.1504/ijise.2013.057493
|View full text |Cite
|
Sign up to set email alerts
|

Economic design of variable sampling intervals <span style="text-decoration: overline">X</span> charts with B&L switching rule

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 27 publications
0
3
0
Order By: Relevance
“…However, as these problems are NP‐hard, metaheuristics are an efficient way to solve them in a reasonable computational time. Thus, here we implement a genetic algorithm (GA), since it has a widely used in most studies for this purpose 10,34–39 . The overall procedure is described in Figure 4.…”
Section: Genetic Algorithm For Model Optimisationmentioning
confidence: 99%
“…However, as these problems are NP‐hard, metaheuristics are an efficient way to solve them in a reasonable computational time. Thus, here we implement a genetic algorithm (GA), since it has a widely used in most studies for this purpose 10,34–39 . The overall procedure is described in Figure 4.…”
Section: Genetic Algorithm For Model Optimisationmentioning
confidence: 99%
“…The control chart technique may be considered as the graphical expression and operation of statistical hypothesis test. Researches on the designs of various control charts may be traced back to 1960's and a lot of theoretical developments and applications on control charts can be still found in recent literatures, such as Haridy et al (2012), Chou et al (2013), Requeijo and Cordeiro (2013), Karaoglan and Bayhan (2014), Liu et al (2014). The control charts with exponentially weighted moving average (EWMA) scheme was first introduced by Roberts (1966) and had been shown to be effective for detecting small shifts in the mean of the process characteristic (e.g., see Saccucci and Lucas, 1990).…”
Section: Introductionmentioning
confidence: 99%
“…One of popular adaptive control schemes is called 'variable sampling interval (VSI)'. The control charts with VSI scheme, in which the sampling interval is not fixed but instead switches between short and long intervals depending on what is observed from the process, had been developed and shown to give substantially faster detection of most process shifts than conventional control charts (see Lin and Chou, 2011;Chou et al, 2013). Therefore, extension to robustness of the EWMA median chart with VSI control scheme to non-normality may be left for further study.…”
mentioning
confidence: 99%