Economic Considerations Underlying the Adoption of HVDC and HVAC for the Connection of an Offshore Wind Farm in Korea

Abstract: -Wind energy is created in mega-sized wind farms situated kilometers off shore. In fact, two possibilities are considered for the transmission system between the offshore wind farm and the onshore grid: high-voltage direct current and high-voltage alternating current. From this point of view, the current paper aims to compare both systems for a 2 GW wind farm situated 80 km from the Point of Common Coupling on an economic basis using a discounted cash flow analysis. A tool is developed in Microsoft Excel to al… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
29
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 24 publications
(29 citation statements)
references
References 5 publications
0
29
0
Order By: Relevance
“…Various generalized methods to perform the economic comparisons are shown in Figure 6. Discounted cash flow (DCF) is selected in this paper, where all forthcoming cash flows are calculated and discounted to obtain net present values (NPV) [6]. …”
Section: Comparison Between Hvac and Hvdcmentioning
confidence: 99%
See 3 more Smart Citations
“…Various generalized methods to perform the economic comparisons are shown in Figure 6. Discounted cash flow (DCF) is selected in this paper, where all forthcoming cash flows are calculated and discounted to obtain net present values (NPV) [6]. …”
Section: Comparison Between Hvac and Hvdcmentioning
confidence: 99%
“…The losses in the VSC based HVDC transmission grid originate from the VSCs (e.g., filters, HVDC station transformers and IGBTs,) that are roughly 7.4% (1.8% for every station), and line joule losses [6]. Losses in the HVAC system are determined by considering the losses in ac grid station (e.g.…”
Section: Annual Costmentioning
confidence: 99%
See 2 more Smart Citations
“…All costs are expressed in INR/km (1 US$= 63 INR). The capital investment cost for constructing the lines can be assigned to one or more years before the line is energized [26]. In this study, it is assumed that all the capital costs occur in the construction starting year.…”