2021
DOI: 10.1016/j.cie.2020.106944
|View full text |Cite
|
Sign up to set email alerts
|

Eco-friendly multi-skilled worker assignment and assembly line balancing problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
17
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 27 publications
(17 citation statements)
references
References 46 publications
0
17
0
Order By: Relevance
“…For example, carbon and noise emissions were attained via connection related to the processing time of manpower and robots for the production line. 26 Other related researches were studied by Nilakantan et al, 25 Zhang et al 26 and Liu et al 39…”
Section: Optimisation Objectives In Alb With Energy Considerationmentioning
confidence: 98%
See 4 more Smart Citations
“…For example, carbon and noise emissions were attained via connection related to the processing time of manpower and robots for the production line. 26 Other related researches were studied by Nilakantan et al, 25 Zhang et al 26 and Liu et al 39…”
Section: Optimisation Objectives In Alb With Energy Considerationmentioning
confidence: 98%
“…43 In addition, lower operational costs could be achieved by the arrangement of manpower in the assembly line. 39 Papers that had discussed the reduction of cost per assembly line together with energy consumption include Janardhanan et al, 33 Liu et al, 39 Zhang et al 40 and Weckenborg and Spengler 43 .…”
Section: Optimisation Objectives In Alb With Energy Considerationmentioning
confidence: 99%
See 3 more Smart Citations