Early Warning of the Construction Safety Risk of a Subway Station Based on the LSSVM Optimized by QPSO

Abstract: Subway station projects are characterized by complex construction technology, complex site conditions, and being easily influenced by the surrounding environment; thus, construction safety accidents occur frequently. In order to improve the computing performance of the early risk warning system in subway station construction, a novel model based on least-squares support vector machines (LSSVM) optimized by quantum-behaved particle swarm optimization (QPSO) was proposed. First, early warning factors from five a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(7 citation statements)
references
References 37 publications
(78 reference statements)
0
7
0
Order By: Relevance
“…BPA(E) is [0.002, 0.106, 0.689, 0.098, 0.106], and BPA(G) is [0.01, 0.958, 0.025, 0, 0.006]. According to equation (3)(4)(5)(6),α is 0.77, β is 1.089, γ is [0.717, 0.572], and the confidence degree is [0.125, 0.162]. According to equation (7)(8) (m(A k ))-max(m(A p ), k≠p) is 0.624 (0.738-0.114=0.624), which is greater than or equal to 0.2.…”
Section: Results and Analysismentioning
confidence: 99%
See 2 more Smart Citations
“…BPA(E) is [0.002, 0.106, 0.689, 0.098, 0.106], and BPA(G) is [0.01, 0.958, 0.025, 0, 0.006]. According to equation (3)(4)(5)(6),α is 0.77, β is 1.089, γ is [0.717, 0.572], and the confidence degree is [0.125, 0.162]. According to equation (7)(8) (m(A k ))-max(m(A p ), k≠p) is 0.624 (0.738-0.114=0.624), which is greater than or equal to 0.2.…”
Section: Results and Analysismentioning
confidence: 99%
“…BPA(E11) is [0, 0, 0.17, 0.657, 0.173], and BPA(E12) is [0.725, 0.007, 0, 0, 0.268]. According to equation (3)(4)(5)(6), the conflict degree (α) is 0.605, the variance degree (β) is 0.998, the uncertainty degree (γ) is calculated as [0.725, 0.68] and the confidence degree is [0.207, 0.22]. The corrected fused BPA is [0.356, 0.004, 0.091, 0.35, 0.2] by equation (7)(8).…”
Section: Results and Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…Yu et al [23] identified safety risks in Chinese subway construction, including safety attitude, construction site safety, and government regulation. In addition, Zhang et al [24] classified subway safety risks into human, machine, management, material, and environmental risks based on accident causation theory and a literature review. Qie and Yan [25] categorized the five types of SCSR identified, including human-type safety risk, equipment-type safety risk, environmental-type safety risk, management-type safety risk, and safety culture-type, and concluded that the human-type risks are the key risks causing high-risk accidents.…”
Section: Literature Review 21 Safety Risk Identification Of Subway Co...mentioning
confidence: 99%
“…The reasons for risk are equally varied. Environmental changes, COVID-19, and mechanical failures can all lead to risks [13][14][15]. The damage can be significant if there is landslide, falling of large components, chemical blasting, or machine collapse [16][17][18].…”
Section: Introductionmentioning
confidence: 99%