2014
DOI: 10.1007/978-3-319-13036-1_20
|View full text |Cite
|
Sign up to set email alerts
|

Early Stage Adoption of ISO/IEC 29110 Software Project Management Practices: A Case Study

Abstract: Abstract. The ISO/IEC 29110 standard has at its core a Management and Engineering Guide [1] which are targeted at very small entities (enterprises, organizations, departments or projects) having up to 25 people [2], to assist them unlock the potential benefits of using standards which are specifically designed to address their needs. This paper discusses the role and structure of Project Management in the ISO/IEC 29110 standard and the design and development of project management support documentation. In part… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
14
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 16 publications
(14 citation statements)
references
References 25 publications
0
14
0
Order By: Relevance
“…Case studies related to the ISO/IEC 29110 standard are usually focused on the basic profile [3,4,5,6,6,8,9,10], since most projects are small enough for using the lightweight process model belonging to the basic profile-i.e., processes useful for Project Management (PM) and Software Implementation (SI). Also, the basic profile can be applied by VSEs to a unique project team with one single application at a time, regardless the specific risks or the situational factors [2].…”
Section: Introductionmentioning
confidence: 99%
“…Case studies related to the ISO/IEC 29110 standard are usually focused on the basic profile [3,4,5,6,6,8,9,10], since most projects are small enough for using the lightweight process model belonging to the basic profile-i.e., processes useful for Project Management (PM) and Software Implementation (SI). Also, the basic profile can be applied by VSEs to a unique project team with one single application at a time, regardless the specific risks or the situational factors [2].…”
Section: Introductionmentioning
confidence: 99%
“…However, it might be a necessity in today's competitive and technological environments. Research shows that VSEs finds it difficult to relate their business needs to these standards and implement them into their business practices (O'Connor 2014).…”
Section: Introductionmentioning
confidence: 99%
“…Literature reports contributions related to the ISO/IEC 29110 in several industrial contexts . Basically, these contributions are related to its adoption, but in general their contributions are wide . In fact, this kind of organisations is facing several hurdles including project management and software implementation perspectives.…”
Section: Introductionmentioning
confidence: 99%