2023
DOI: 10.1109/twc.2022.3200366
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic Super Round-Based Distributed Task Scheduling for UAV Networks

Abstract: Networks of Unmanned Aerial Vehicles (UAVs) are emerging in many application domains, e.g., military surveillance. To perform collaborative tasks, the involved UAVs exchange several types of information, e.g., sensor data and commands. The major question here is how to schedule the tasks under dynamic traffic flows to provide network services. Existing solutions use the Round-Robin Strategy (RRS), where the tasks are scheduled statistically by dividing the time into fixed-length rounds. However, the RRS wastes… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 44 publications
0
1
0
Order By: Relevance
“…The final task sequences assigned to the UAVs are as follows: UAV 0 performs tasks [2,4], UAV 1 performs tasks [0, 8, 5], UAV 2 performs tasks [6,3,7], and UAV 3 performs task [1]. Each UAV will execute its assigned tasks in the order specified.…”
Section: Encode Chromosomementioning
confidence: 99%
See 2 more Smart Citations
“…The final task sequences assigned to the UAVs are as follows: UAV 0 performs tasks [2,4], UAV 1 performs tasks [0, 8, 5], UAV 2 performs tasks [6,3,7], and UAV 3 performs task [1]. Each UAV will execute its assigned tasks in the order specified.…”
Section: Encode Chromosomementioning
confidence: 99%
“…The mutation point occurs on the slave chromosome corresponding to UAV2, which is divided into a head (3) and a tail (4,5). The nodes in the tail are connected to the tails of the other slave chromosomes (2,8,9). An attempt is made to construct the probabilistic chain, and the shortest probabilistic chain is selected, which will be the continuation of the tail to the back of that slave chromosome.…”
Section: Pc-epga Variation Operatormentioning
confidence: 99%
See 1 more Smart Citation
“…RR consists of assigning the resources in equal parts and a circular form, handling the whole process without priorities. Therefore, this scheduler tends to perform a homogeneous distribution of the available resources and is characterized by presenting a good fairness index among the UEs [20].…”
Section: Resource Allocation Considering Ns and D2dmentioning
confidence: 99%