IEEE International Symposium on Electronics and the Environment, 2003.
DOI: 10.1109/isee.2003.1208081
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic scheduling and line balancing methods, and software tools for lean and reconfigurable disassembly cells and lines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 10 publications
0
8
0
Order By: Relevance
“…Task processing times: The disassembly task processing times are the most common uncertain parameter considered in DLB models. While , Özceylan and Paksoy (2014c), Kalayci et al (2015b), Seidi and Saghari (2016) and Zhang et al (2017) assumed fuzzy task processing time; the disassembly task times are assumed to be independent random variables with known and normal probability distributions by Kekre et al (2003), Ranky et al (2003), Gupta (2004, 2005), Agrawal and Tiwari (2008), Karadağ and Türkbey (2013), Bentaha et al (2013aBentaha et al ( , 2013bBentaha et al ( , 2013cBentaha et al ( , 2013dBentaha et al ( , 2013e, 2014aBentaha et al ( , 2014bBentaha et al ( , 2014cBentaha et al ( , 2014dBentaha et al ( , 2014e, 2015aBentaha et al ( , 2015b A general summary of uncertainty issues in existing DLB studies is given in Table 4. As can be seen from Table 4, all factors except task failures are considered fuzzy, and the task processing time is the most frequently studied uncertain factor handled as stochastic.…”
Section: Performance Measures Studiesmentioning
confidence: 99%
See 1 more Smart Citation
“…Task processing times: The disassembly task processing times are the most common uncertain parameter considered in DLB models. While , Özceylan and Paksoy (2014c), Kalayci et al (2015b), Seidi and Saghari (2016) and Zhang et al (2017) assumed fuzzy task processing time; the disassembly task times are assumed to be independent random variables with known and normal probability distributions by Kekre et al (2003), Ranky et al (2003), Gupta (2004, 2005), Agrawal and Tiwari (2008), Karadağ and Türkbey (2013), Bentaha et al (2013aBentaha et al ( , 2013bBentaha et al ( , 2013cBentaha et al ( , 2013dBentaha et al ( , 2013e, 2014aBentaha et al ( , 2014bBentaha et al ( , 2014cBentaha et al ( , 2014dBentaha et al ( , 2014e, 2015aBentaha et al ( , 2015b A general summary of uncertainty issues in existing DLB studies is given in Table 4. As can be seen from Table 4, all factors except task failures are considered fuzzy, and the task processing time is the most frequently studied uncertain factor handled as stochastic.…”
Section: Performance Measures Studiesmentioning
confidence: 99%
“…Hazardous work-pieces 55 Güngör and Gupta (1999a; Güngör et al (2000); Gupta and Güngör (2001); McGovern and Gupta (2003a; McGovern, ; Gupta (2004, 2005); Lambert and Gupta (2005b); Wang et al (2011); Avikal and Mishra (2012); Karadağ and Türkbey (2013); Avikal et al (2013cAvikal et al ( , 2014cAvikal et al ( , 2016; Kalayci and Gupta (2011a; Bentaha et al (2013bBentaha et al ( , 2013aBentaha et al ( , 2014e, 2014bBentaha et al ( , 2014dBentaha et al ( , 2015aBentaha et al ( , 2015b; ; ; Kalayci et al (2011Kalayci et al ( , 2015aKalayci et al ( , 2015b McGovern and ; Lambert and Gupta (2005b); Ding et al (2009Ding et al ( , 2010b; Wang et al (2011); Avikal and Mishra (2012); Avikal et al (2013cAvikal et al ( , 2014cAvikal et al ( , 2016; Kalayci and Gupta (2011a; ; ; Kalayci et al (2011Kalayci et al ( , 2015bKalayci et al ( , 2015a (No complication) 28 ; Ranky et al (2003); McGovern and Gupta (2004); Lambert and Gupta (2005a); Tang and Zhou (2006); ; ; ; ;…”
Section: Considered Complications Frequency Studiesmentioning
confidence: 99%
“…The second step aims at balancing the workload of the stations and uses a 2-opt exchange local search algorithm to improve the initial solution. Ranky et al (2003) propose a dynamic disassembly line balancing algorithm that aims at smoothing the load of the shop floor. They extend the COMSOAL algorithm (Arcus, 1966) used for ALBP to obtain a balanced schedule in which all precedence relations are met and flow time of the discarded product is minimized.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Some researchers are focusing more on logical activity of Reconfigurable Manufacturing System (RMS). Some aspects are examined in RMS logical activities, including scheduling and operational aspects [8], [9], [10], and strategic aspects of flexibility and convenience for the reconfigured [11], [12]. Design models and product family grouping was also developed for the determination of the module in designing RMS [13], [14], [15].…”
Section: Introductionmentioning
confidence: 99%