Dynamic Response and Safety Control of Newly Poured Secondary Lining Concrete under Large Section Tunnel Blasting-A Case Study of Longnan Tunnel of Ganshen High-speed Railway
Abstract:The age of newly poured concrete is short, the cementation between aggregates is weak. At this time, the vibration will affect its performance. The secondary lining concrete newly poured in the tunnel is close to the work face and is susceptible to blasting vibration during construction. In order to study the safety threshold of blasting vibration velocity of newly poured secondary lining concrete in tunnels, the finite element model is established in ANSYS with the large-section Longnan tunnel project as an e… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.