2022
DOI: 10.3311/ppci.20206
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic Response and Safety Control of Newly Poured Secondary Lining Concrete under Large Section Tunnel Blasting-A Case Study of Longnan Tunnel of Ganshen High-speed Railway

Abstract: The age of newly poured concrete is short, the cementation between aggregates is weak. At this time, the vibration will affect its performance. The secondary lining concrete newly poured in the tunnel is close to the work face and is susceptible to blasting vibration during construction. In order to study the safety threshold of blasting vibration velocity of newly poured secondary lining concrete in tunnels, the finite element model is established in ANSYS with the large-section Longnan tunnel project as an e… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 15 publications
(16 reference statements)
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?