2001
DOI: 10.1061/(asce)0733-9364(2001)127:1(1)
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
46
0
2

Year Published

2003
2003
2019
2019

Publication Types

Select...
5
3
2

Relationship

1
9

Authors

Journals

citations
Cited by 129 publications
(48 citation statements)
references
References 5 publications
0
46
0
2
Order By: Relevance
“…There are several ways to speed up an activity, in order to get the best alternative based on the conditions of the implementing contractor (Pena-Mora, Li, 2001). These are the ways, for example: a.…”
Section: Methodsmentioning
confidence: 99%
“…There are several ways to speed up an activity, in order to get the best alternative based on the conditions of the implementing contractor (Pena-Mora, Li, 2001). These are the ways, for example: a.…”
Section: Methodsmentioning
confidence: 99%
“…Three years later, in 2001, Peña-Mora and Li [30] developed a dynamic planning and control methodology by integrating axiomatic design, concurrent engineering, the graphical evaluation and review technique (GERT) and system dynamics modelling. The major contribution of this work was the inclusion of a probabilistic view of activity overlaps.…”
Section: Gwak Et Al (2016) [39]mentioning
confidence: 99%
“…Consequently, the dependency relationships between design and construction tasks need to be analyzed and served as the overlapping relationships so that a DB project can be logically partitioned into concurrent design and construction phases. Some related researches are useful and referred for creating the fast-tracking model [5][6][7]. By applying dependency structure matrix (DSM), the Analytical Design Planning Technique (ADePT) was addressed by Austin [7] to analyze the information dependencies between design activities, and provided an appropriate mechanism to schedule a design process.…”
Section: Fast-tracking Model Creationmentioning
confidence: 99%