2020
DOI: 10.1016/j.cor.2019.104779
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic dispatching and preventive maintenance for parallel machines with dispatching-dependent deterioration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(1 citation statement)
references
References 30 publications
0
1
0
Order By: Relevance
“…Pandey et al 9 and Hadidi et al 10 considered the integration of system maintenance and production scheduling, established a comprehensive model of single machine scheduling and maintenance. Wu et al 11 and Lee and Cehn 12 used the same type of parallel machine as the research object, and optimized the maximum completion time as the goal to establish an integrated model of parallel scheduling and maintenance. Several studies 1317 have established an integrated model of production scheduling and maintenance for job shop, flow shops, and flexible job shops.…”
Section: Introductionmentioning
confidence: 99%
“…Pandey et al 9 and Hadidi et al 10 considered the integration of system maintenance and production scheduling, established a comprehensive model of single machine scheduling and maintenance. Wu et al 11 and Lee and Cehn 12 used the same type of parallel machine as the research object, and optimized the maximum completion time as the goal to establish an integrated model of parallel scheduling and maintenance. Several studies 1317 have established an integrated model of production scheduling and maintenance for job shop, flow shops, and flexible job shops.…”
Section: Introductionmentioning
confidence: 99%