2010 Asia-Pacific Power and Energy Engineering Conference 2010
DOI: 10.1109/appeec.2010.5449235
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic Application and Risk Analysis of Flood Control Water Level to the Three Gorges Reservoir by Utilizing Mid-Term Inflow Forecasts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
2
0
3

Year Published

2014
2014
2020
2020

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 0 publications
0
2
0
3
Order By: Relevance
“…In [2], a reservoir operation scheme for flood control based on real-time information and forecasts is proposed for the Three Gorges project. In [3], a flood control model for the rainy seasons is proposed, applying a reliability and risk analysis based on hydrological forecasts also for the Three Gorges project. In Mozambique, a flood control model was proposed using a hydroelectric reservoir to mitigate the social impact of electricity generation [4].…”
Section: Introductionmentioning
confidence: 99%
“…In [2], a reservoir operation scheme for flood control based on real-time information and forecasts is proposed for the Three Gorges project. In [3], a flood control model for the rainy seasons is proposed, applying a reliability and risk analysis based on hydrological forecasts also for the Three Gorges project. In Mozambique, a flood control model was proposed using a hydroelectric reservoir to mitigate the social impact of electricity generation [4].…”
Section: Introductionmentioning
confidence: 99%
“…Zhou et al (2009) established an evaluation index system on the optimization of dynamic flood control limited water level (DFCLWL) based on the analysis of factors influencing DFCLWL. Dong et al (2010) carried out the reliability and risk analysis of a methodology of dynamically applying FLWL within a constraint boundary for the Three Gorges Reservoir based on the mid-term inflow forecasts. Chen et al (2013) proposed a composition and decomposition-based model for the joint operation and dynamic control of FLWL to Qingjiang River cascade.…”
Section: Introductionmentioning
confidence: 99%
“…Por su parte, Guohua, Guoli y Shufeng propusieron [2] un esquema de operación de embalses para el control de inundaciones, basado en información en tiempo real y pronósticos para el proyecto de Tres Gargantas. En [3] se plantea un modelo de control de inundaciones para las temporadas de lluvias, aplicando un análisis de confiabilidad y riesgo, basado en los pronósticos hidrológicos también para el proyecto de Tres Gargantas. En Mozambique, se planteó el control de inundaciones utilizando un embalse hidroeléctrico para mitigar el impacto social y reflejando la afectación sobre la generación de energía eléctrica [4].…”
Section: Introductionunclassified
“…Volumen de las cuentas que ingresan al embalse en el periodo . MWh/ Mm 3 Factor de conversión del embalse .…”
unclassified