2018
DOI: 10.17270/j.log.2018.290
|View full text |Cite
|
Sign up to set email alerts
|

Untitled

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
2
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 12 publications
0
2
0
Order By: Relevance
“…Many researchers have studied the use of PERT/CPM techniques for BPM such as simulation for the execution, control and management, optimization methods to analyze the workflow system, to-be models, resource constraint-based process models and reduced process cycle time in terms of I4.0 process (e.g. Gunasekaran and Kobu, 2002;Rhee et al, 2004;Aytulun and Guneri, 2008;Ajiboye, 2011;Xie et al, 2013;Jim enez-Ram ırez et al, 2015;Erdei et al, 2018;Mustapha et al, 2018). Furthermore, studies on resource allocation and RCPSP in BPM have been conducted across a broad range of topics (e.g.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Many researchers have studied the use of PERT/CPM techniques for BPM such as simulation for the execution, control and management, optimization methods to analyze the workflow system, to-be models, resource constraint-based process models and reduced process cycle time in terms of I4.0 process (e.g. Gunasekaran and Kobu, 2002;Rhee et al, 2004;Aytulun and Guneri, 2008;Ajiboye, 2011;Xie et al, 2013;Jim enez-Ram ırez et al, 2015;Erdei et al, 2018;Mustapha et al, 2018). Furthermore, studies on resource allocation and RCPSP in BPM have been conducted across a broad range of topics (e.g.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The CPM method was used for process cycle time without resource constraint in the process analysis stage. In the literature, the CPM method has been applied in BPM to focus on the calculation of cycle time for the process (Gunasekaran and Kobu, 2002;Ajiboye, 2011;Erdei et al, 2018;Mustapha et al, 2018). Therefore, this study focuses on calculating the cycle time of the process in the process analysis stage as the as-is model.…”
Section: Theoretical Implicationsmentioning
confidence: 99%
“…Przedsiębiorstwa rolnicze charakteryzują się kapitałochłonnością, niską rentownością, powolnym zwrotem kapitału i wysokim ryzykiem. Większość tych cech wynika z sezonowości produkcji rolnej (Erdei, Popp, Oláh, 2018). Należy pamiętać, że w analizach finansowych przedsiębiorstw rolnych dane bilansowe na koniec roku zazwyczaj nie odzwierciedlają faktycznego zarządzania przedsiębiorstwem rolnym i często są słabsze od danych na koniec roku (Gál, 2013).…”
Section: Materiały I Metodyunclassified
“…Agricultural enterprises are specific in the following aspects: capital intensive, low profitability, slow return on capital, and high risk. Most of these characteristics result from the seasonality of agricultural production (Erdei, Popp, Oláh, 2018). In financial analyses of agricultural enterprises, it is important to bear in mind that the year-end balance sheet figures for agricultural enterprises do not usually reflect the actual management of the agricultural enterprise and are often worse than the year-end figures (Gál, 2013).…”
Section: Materiały I Metodymentioning
confidence: 99%