2004
DOI: 10.1007/978-1-4020-7953-5_12
|View full text |Cite
|
Sign up to set email alerts
|

Due Date Management Policies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
40
0
1

Year Published

2004
2004
2016
2016

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 87 publications
(41 citation statements)
references
References 96 publications
0
40
0
1
Order By: Relevance
“…Una manera ampliamente aceptada de clasificar los modelos que tratan de asignar ATP a pedidos de clientes se basa en el tipo de respuesta o modo de funcionamiento de dichos modelos (6)(7)(8). Desde este punto de vista, algunos modelos tratan de asignar el ATP en tiempo real ("on-line" o "realtime") para proporcionar una respuesta inmediata a cada propuesta de pedido, según ésta llega y el orden en que llega ("first come first served" ó FCFS) (9-11).…”
Section: Revisión De La Literaturaunclassified
“…Una manera ampliamente aceptada de clasificar los modelos que tratan de asignar ATP a pedidos de clientes se basa en el tipo de respuesta o modo de funcionamiento de dichos modelos (6)(7)(8). Desde este punto de vista, algunos modelos tratan de asignar el ATP en tiempo real ("on-line" o "realtime") para proporcionar una respuesta inmediata a cada propuesta de pedido, según ésta llega y el orden en que llega ("first come first served" ó FCFS) (9-11).…”
Section: Revisión De La Literaturaunclassified
“…Surveys of due date scheduling problems, with hundreds of references, can be found [5] and [6]. As always with scheduling problems, there is a vast number of reasonable formulations that have been studied.…”
Section: Related Previous Workmentioning
confidence: 99%
“…Quoted Lead Time The standard quality of service measure for a job J i is the quoted lead time (QLT), which is defined to be d i − r i [5,6]. Probably the most natural related objective is to minimize the average, or equivalently total, quoted lead times of the jobs under the constraint that all jobs must be finished by their due date.…”
Section: Introductionmentioning
confidence: 99%
“…Thus a problem that considers leadtime differentiation may combine pricing decisions with leadtime quotation and production scheduling, although few have considered all of these simultaneously. For a thorough review of papers in leadtime quotation (including some with a pricing decision), see [78] in this book.…”
Section: 13mentioning
confidence: 99%