2016
DOI: 10.1016/j.petrol.2015.12.009
|View full text |Cite
|
Sign up to set email alerts
|

Drivers to the workover rig problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
16
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(16 citation statements)
references
References 36 publications
0
16
0
Order By: Relevance
“…These interventions (also called workovers) require the use of workover rigs, big structures transported by trucks that can be dismounted and mounted from one well to another. Several types of maintenance might be performed by the workover rigs: cleaning, reinstatement or substitution of production equipment, stimulation of reservoir, besides others (BISSOLI, CHAVES & RIBEIRO, 2016;MONEMI et al, 2015).…”
Section: Opening Remarksmentioning
confidence: 99%
See 4 more Smart Citations
“…These interventions (also called workovers) require the use of workover rigs, big structures transported by trucks that can be dismounted and mounted from one well to another. Several types of maintenance might be performed by the workover rigs: cleaning, reinstatement or substitution of production equipment, stimulation of reservoir, besides others (BISSOLI, CHAVES & RIBEIRO, 2016;MONEMI et al, 2015).…”
Section: Opening Remarksmentioning
confidence: 99%
“…Besides, in some cases, workover rigs are slow mobile units, moving at a speed of mph. Consequently, the time to go from one well to another is an important factor to be considered while scheduling the workover rigs (ALOISE et al, 2006;BISSOLI, CHAVES & RIBEIRO, 2016).…”
Section: Opening Remarksmentioning
confidence: 99%
See 3 more Smart Citations