“…Previous work reduces the risk of geological uncertainty and increases the return on the drilling program [ 17 , 18 ]. However, their optimal solution is to maximize the value of the remaining reservoir in the shortest possible time, rather than focusing on the proper sequence of drilling to ensure the target production [ 19 , 20 ] developed a model based on a genetic algorithm and a reservoir simulator for optimal drilling scheduling [ 21 ].…”