Double Casing Exit for Side-Track to Commingle Two Borehole Sizes Based Sections in One Slim Shot to Well TD

Abstract: This project began when a 9-5/8" in 43.5 ppf production casing became inaccessible due to the existing cemented pipe inside, preventing further reservoir section exposure and necessitating a mechanical side-track meanwhile introducing the challenge of loosing one section and imposimg slim hole challenges. The size and weight of the double-casing made for challenging drilling, as did the eight very different formations, which were drilled. The side-track was accomplished in two steps, an 8½ in hole followed by … Show more