Volume 3: Hazardous Waste; Engineered/Geological Barriers in Disposal Systems; L/Ilw; Radioactive Waste From Research/Industrie 2001
DOI: 10.1115/icem2001-1280
|View full text |Cite
|
Sign up to set email alerts
|

Dismantling of the BR3 Reactor Pressure Vessel

Abstract: The BR3 PWR is a small nuclear power plant (thermal power 40.9 MWth, net electrical power output 10.5 MWe), designed in the late fifties and started in 1962. It was definitely shut down in 1987. In 1989 the BR3 was selected by the European Union as pilot decommissioning project in the framework of its RTD programme on the decommissioning of nuclear installations. A pre-dismantling decontamination of the reactor primary loop was carried out and allowed to save doses to the operators. The savings … Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles