2018
DOI: 10.1016/j.jclepro.2017.10.308
|View full text |Cite
|
Sign up to set email alerts
|

Disassembly line balancing problem using interdependent weights-based multi-criteria decision making and 2-Optimal algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
12
0
3

Year Published

2018
2018
2020
2020

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 80 publications
(15 citation statements)
references
References 30 publications
0
12
0
3
Order By: Relevance
“…Avikal et al [7] used the Kano model, fuzzy analytic hierarchy process (AHP), and modified technique for Order Preference by Similarity to an Ideal Solution (M-TOPSIS) method to solve the DLBP. Ren et al [8] proposed a disassembly line balanced multi-objective optimization method based on the 2-optimal algorithm and multi-criteria decision making (MCDM). The DLBP also can be solved based on Monte Carlo reinforcement learning methods [9].…”
Section: Disassembly Line Balancing Problemmentioning
confidence: 99%
“…Avikal et al [7] used the Kano model, fuzzy analytic hierarchy process (AHP), and modified technique for Order Preference by Similarity to an Ideal Solution (M-TOPSIS) method to solve the DLBP. Ren et al [8] proposed a disassembly line balanced multi-objective optimization method based on the 2-optimal algorithm and multi-criteria decision making (MCDM). The DLBP also can be solved based on Monte Carlo reinforcement learning methods [9].…”
Section: Disassembly Line Balancing Problemmentioning
confidence: 99%
“…At present, three methods of defuzzification are applied to transform the fuzzy number into a crisp number [35]- [37].…”
Section: B: Defuzzificationmentioning
confidence: 99%
“…It is noteworthy that a large number of studies [38], [40] which are related to maintenance evaluation do not focus on the interaction among criterions. However, the interaction among criterions is usually inevitable in evaluation process [37]. Hence, Choquet integral based on λ-fuzzy measure is used to overcome the shortcoming for evaluating the team maintenance capability.…”
Section: B: Defuzzificationmentioning
confidence: 99%
“…Bu araştırmada elde edilen sonuçlar yazındaki sonuçlar ile karşılaştırıldığında yazında elde edilen en iyi çözüm olan Ren (2018) ile aynı derecede iyi sonuçlar elde edildiği görülmektedir. Sonuçlar aynı olduğu için çözüm yöntemin karmaşıklığı analiz edilmiştir.…”
Section: Sonuçunclassified