Disassembly Line Balancing and Sequencing under Uncertainty

Abstract: International audienceThe present work deals with the problem of stochastic disassembly line balancing and sequencing in the presence of hazardous parts of the End of Life (EOL) product. The case of partial disassembly process is considered. The objective is to design a production line with a maximum profit under uncertainty of task times which are assumed to be random variables with known probability distributions. Tasks of the best selected disassembly alternative are to be assigned to a sequence of workstat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
27
0
1

Year Published

2015
2015
2021
2021

Publication Types

Select...
5
4

Relationship

2
7

Authors

Journals

citations
Cited by 54 publications
(28 citation statements)
references
References 23 publications
0
27
0
1
Order By: Relevance
“…Bentaha, Battaïa, and Dolgui (2014a, 2014b, 2014c, 2015 and Bentaha, Battaïa, and Dolgui (2014d) studied complete and partial disassembly models, respectively. Bentaha et al (2014a) modeled uncertainty using the notion of resource cost and proposed a sample average approximation method.…”
Section: Disassembly Process and The Related Literaturementioning
confidence: 99%
“…Bentaha, Battaïa, and Dolgui (2014a, 2014b, 2014c, 2015 and Bentaha, Battaïa, and Dolgui (2014d) studied complete and partial disassembly models, respectively. Bentaha et al (2014a) modeled uncertainty using the notion of resource cost and proposed a sample average approximation method.…”
Section: Disassembly Process and The Related Literaturementioning
confidence: 99%
“…Nous pouvons citer Turowski et Morgan (2005) ; Agrawal et Tiwari (2006) ; Aydemir-Karadag et Turkbey (2013). En particulier, les travaux dans Bentaha et al (2013a ;2013b ;2013c ;2013d ;2013e) ;Bentaha, Battaïa, Dolgui et Hu (2014) ;Bentaha, Battaïa et Dolgui (2014a ;2014b ;2014c) ; ; , proposent des modélisations et des approches de résolution exactes permettant la sélection de la meilleure alternative de désassemblage sous incertitudes des durées opératoires des tâches. Cependant, l'état des produits en fin de vie n'a pas été pris en compte de manière explicite.…”
Section: Revue De Littératureunclassified
“…In Bentaha, Battaïa, Dolgui, and Hu (2014d), uncertainty was modeled using workstation expectation times. In Bentaha, Battaïa, and Dolgui (2014b), a stochastic program was developed for the joint problem of disassembly line balancing and sequencing under uncertainty. In Bentaha, Battaïa, and Dolgui (2014c), a Lagrangian relaxation was proposed to maximize the disassembly line profit under task times variability where workstation expectation times are considered.…”
Section: Disassembly Line Design and Balancingmentioning
confidence: 99%
“…There are two types of such graphs: AND/OR graphs constituted of tasks and AND/OR graphs constituted of tasks and subassemblies. The first type is considered in (Altekin & Akkan, 2012;Altekin, Kandiller, & Ozdemirel, 2008;Güngör & Gupta, 2001, 2002, the second in (Bentaha et al, 2014a(Bentaha et al, , 2014b(Bentaha et al, , 2014c(Bentaha et al, , 2014dKoc, Sabuncuoglu, & Erel, 2009;Lambert, 1999). The latter which includes an explicit representation of subassemblies as well as tasks, is used in this paper.…”
Section: Disassembly Line Design and Balancingmentioning