2017
DOI: 10.1166/jctn.2017.7047
|View full text |Cite
|
Sign up to set email alerts
|

Differential Evolution with Parameter Adaptation Strategy for an Optimal Dispatch of Residential Distributed Energy Sources

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…The universal speed of Ultrasonic wave at room conditions is 330 m/s. The circuitry inbuilt on the module will calculate the time taken for the wave to reflect and turns on the echo pin for that same particular amount of time, this way we can also know the time taken [12].…”
Section: Scaling and Measurement Of Valuesmentioning
confidence: 99%
See 2 more Smart Citations
“…The universal speed of Ultrasonic wave at room conditions is 330 m/s. The circuitry inbuilt on the module will calculate the time taken for the wave to reflect and turns on the echo pin for that same particular amount of time, this way we can also know the time taken [12].…”
Section: Scaling and Measurement Of Valuesmentioning
confidence: 99%
“…The typical faults are open circuit, overheating, and winding faults. It is necessary to monitor its parameters and keep them under restricted values [12]. For the measurement of electrical parameters, MFM384-C meter is used, which has been explained in Section 2.3.1.…”
Section: Measurement Of Electrical Parametersmentioning
confidence: 99%
See 1 more Smart Citation
“…But the success of DE algorithm depends on the choice of parameters like population size np, mutation rate Fand crossover rate CRvaries its performance (searching accuracy and convergence speed). Hence, in [22], an improved version of DE algorithm is implemented to solve the above complex non-linear problems. In this paper, that modified DE algorithm is being used to optimize the various parameters of the HRES system in [23], and the objective function is to minimize the final system cost.…”
Section: Introductionmentioning
confidence: 99%
“…[24][25][26] Also, the coordinated operation technique is proposed to improve the convenience of electric vehicles and sustainable power source, where DS replaces the two-layer frame by customary layer serving conventional burdens and novel layer that interact to sustainable power source and electric vehicles. 27,28 Extraordinarily, a few researches consider the administration nature of EVCS incorporated to DS that is the basic for the backup program. To augment the utility of EVCS, the EVCS are associated with the DS by new queuing system model, and takes into account the EVCS nature of administration.…”
mentioning
confidence: 99%