2021
DOI: 10.15587/1729-4061.2021.242744
|View full text |Cite
|
Sign up to set email alerts
|

Devising an integrated method for evaluating the efficiency of scrum-based projects in the field of information technology

Abstract: An integrated method for evaluating the effectiveness of projects in the field of information technology has been proposed, which could ensure effective management decision-making. All features inherent in the implementation of the Scrum methodology used in the management of information technology projects have been taken into consideration. Ambiguous situations that constantly arise during the implementation of projects affect their effectiveness. Therefore, constant monitoring of the project efficiency would… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 8 publications
(9 citation statements)
references
References 7 publications
0
6
0
Order By: Relevance
“…[45] showed through their work that proper, regular updating of security strategy and techniques is very important to ensure the security level of BYOD mobile devices in a hybrid environment. In the rapidly changing world of information technology, new threats are constantly emerging, and the security strategy must be flexible and able to adapt to these changes [46][47][48]. Regularly updating security strategies and practices helps an organization to be prepared for new challenges and improve the protection of sensitive data and resources [49].…”
Section: Discussionmentioning
confidence: 99%
“…[45] showed through their work that proper, regular updating of security strategy and techniques is very important to ensure the security level of BYOD mobile devices in a hybrid environment. In the rapidly changing world of information technology, new threats are constantly emerging, and the security strategy must be flexible and able to adapt to these changes [46][47][48]. Regularly updating security strategies and practices helps an organization to be prepared for new challenges and improve the protection of sensitive data and resources [49].…”
Section: Discussionmentioning
confidence: 99%
“…for breakeven price values, γ c ∈(0; c * /c 0 ], where the breakeven value c 0 can be obtained from (9) at NPV * = 0. Risk (17) decreases with price growth and is maximum at c p = c 0 .For price values acceptable to the investor, the maximum risk value ( 17) is equal to 1 when margin β c = 0.…”
Section: Assessment Of the Risk Of Unacceptably Low Profitability Of ...mentioning
confidence: 99%
“…A model of the project efficiency index was constructed in [17] on the basis of the methods of hierarchy analysis, fuzzy set theory, and expert survey. The proposed approach is interesting but its objectivity is questionable since it is largely based on essentially subjective methods of expert evaluation.…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%
“…Using the methodology from [19] for constructing and analyzing a fuzzy situational graph, the situations, which represent the real state, are described through the criteria and indicators of the project's effectiveness [20] in the current period. If the situation does not correspond to the planned values of the relevant indicators, then there is a problem.…”
Section: Project Risk Management Model In the Form Of A Fuzzy Situati...mentioning
confidence: 99%