2005
DOI: 10.1007/s10913-005-0093-1
|View full text |Cite
|
Sign up to set email alerts
|

Devices for Continuous Recording of the Parameters of Deformation — Wave Processes in Rock Mass. Part I: Measurement of Longitudinal Movements of Rocks in a Borehole and Design of the Position Sensor

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2005
2005
2013
2013

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…Chinakal Institute of Mining and TDISIE SB RAS). Deformation and EME recording channels are synchronized using AD converter [32,33].…”
Section: Wide-area Multiprocessor Seismic-electromagnetic Monitoring mentioning
confidence: 99%
See 1 more Smart Citation
“…Chinakal Institute of Mining and TDISIE SB RAS). Deformation and EME recording channels are synchronized using AD converter [32,33].…”
Section: Wide-area Multiprocessor Seismic-electromagnetic Monitoring mentioning
confidence: 99%
“…18). The stand includes a rigid basis, immovable cylindrical section with a coordination unit (alignment unit), reference modulus of a device to be tested, mobile cylindrical section with the alignment unit, deformometer [33], indicators of linear displacements, instrumentation table, laser tacheometer (not shown in Fig. 18) and autocollimator AKU-02.…”
Section: Multi-purpose Metrological Testing Stand For Downhole Multi-mentioning
confidence: 99%