2013
DOI: 10.1016/j.tust.2012.11.005
|View full text |Cite
|
Sign up to set email alerts
|

Development of tunneling influence zones for adjacent pile foundations by numerical analyses

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
23
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
9
1

Relationship

2
8

Authors

Journals

citations
Cited by 89 publications
(28 citation statements)
references
References 19 publications
1
23
0
Order By: Relevance
“…A typical "step-by-step" approach was adopted to simulate the shield construction process [13,53,54]. e numerical modelling consisted of three key steps, i.e., shield tunneling, lining assembly, and shield tail grouting.…”
Section: Numerical Proceduresmentioning
confidence: 99%
“…A typical "step-by-step" approach was adopted to simulate the shield construction process [13,53,54]. e numerical modelling consisted of three key steps, i.e., shield tunneling, lining assembly, and shield tail grouting.…”
Section: Numerical Proceduresmentioning
confidence: 99%
“…[12]. The properties of soils and material parameters for the simulations in Bangkok subsoil are calibrated by [13][14] and has been used in previous research [15].  are tunnel diameters before and after the effect of pile rows under loading, respectively.…”
Section: Initial Conditionsmentioning
confidence: 99%
“…The properties of soils are determined from MRT projects [14]. The material parameters for the simulations of geotechnical work in Bangkok subsoil are calibrated by [15] and has been used in previous research [16]. Table 1 Material properties of the bore pile, tunnel lining and grouting layer [16].…”
Section: Model Parametersmentioning
confidence: 99%