2013
DOI: 10.1016/j.nimb.2013.07.049
|View full text |Cite
|
Sign up to set email alerts
|

Development of target ion source systems for radioactive beams at GANIL

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
7
2

Relationship

2
7

Authors

Journals

citations
Cited by 13 publications
(7 citation statements)
references
References 13 publications
0
7
0
Order By: Relevance
“…In 2013, these issues were fixed by enabling a displacement of the ion source along the axis of the secondary ion beam extraction ( Fig. 3) [14]. The modified TISS was then tested at nominal power (1200W of 36 Ar at 95 AMeV) in the SPIRAL 1 beam lines in December 2013, leading to the first scientific results obtained at SPIRAL 1 with a FEBIAD source [15,16].…”
Section: Tiss Developmentmentioning
confidence: 99%
See 1 more Smart Citation
“…In 2013, these issues were fixed by enabling a displacement of the ion source along the axis of the secondary ion beam extraction ( Fig. 3) [14]. The modified TISS was then tested at nominal power (1200W of 36 Ar at 95 AMeV) in the SPIRAL 1 beam lines in December 2013, leading to the first scientific results obtained at SPIRAL 1 with a FEBIAD source [15,16].…”
Section: Tiss Developmentmentioning
confidence: 99%
“…The wrong steering caused lower yields than expected. As it was observed later with a Nanogan TISS delivering 14 O to the E744 experiment, a factor of 50 to 100 improvement of the production yield could be obtained at the SPIRAL identification station [18] by tuning the primary beam steerers to correct for the faulty diagnostic. The wrong steering might even have been a possible cause for the early failure of the FEBIAD TISS with 20 Ne.…”
Section: Tiss Developmentmentioning
confidence: 99%
“…In the scope of extending the actual RIBs to those based on condensable radioactive species, an upgrade of the facility has been undertaken using the well-known 1+ / n+ method developed at LPSC Grenoble [1]. The method chosen to achieve the objectives of the upgrade is the development of new TISSs (Target Ion source Systems) with a high efficiency [2,3,4], while preserving main parts of the existing SPIRAL1 facility unchanged: the main building, the TISS handling system and the most parts of the LEBT (Low Energy Beam Transport) beam lines. Nevertheless, two major modifications have been realized: the transformation of the production cave to host new TISS's and the installation of a charge breeder after the exit of the cave, downstream from the 1+ magnetic mass separator, in the middle of the LEBT.…”
Section: Introductionmentioning
confidence: 99%
“…Since 2001 SPIRAL1 at GANIL produces radioactive ion beams via the ISOL method ( 77 ). The facility hosts five different cyclotrons for the production and acceleration of RIBs ( 78 ).…”
Section: Production Of 11 C Beams: Overview Of Pas...mentioning
confidence: 99%