Development of Project Communication Network: A New Approach to Information Flow Modeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…In any construction project, establishing coordination and transitioning from one stage of construction to the next is key to completing the project on schedule and cost effectively [56,57,58,59,60,61]. Presumably, since the procedure in modular construction is different, the need for coordination will be a greater challenge [54,55].…”
Section: Excessive Coordination Neededmentioning
confidence: 99%
“…In any construction project, establishing coordination and transitioning from one stage of construction to the next is key to completing the project on schedule and cost effectively [56,57,58,59,60,61]. Presumably, since the procedure in modular construction is different, the need for coordination will be a greater challenge [54,55].…”
Section: Excessive Coordination Neededmentioning
confidence: 99%
“…According to the studies conducted by Alipour et al [12], it is easier to establish effective communication and coordination among those in a rural area because rural communities commonly follow their local leaders, while those in urban communities want to know every detail of the process, making the controlling and management of them complicated [17].…”
Section: General Challengesmentioning
confidence: 99%
“…The most important factors causing time overrun are design changes, poor labor productivity, inadequate planning, and resource shortages. Through a comparative study of causes of time overruns in construction projects in Hong Kong (Kamalirad et al, 2017). In Malaysian, traditional lump sum system, design and build/turnkey system and Construction Project Management/Contract Management are commonly adopted in procurement strategies (Memon et al, 2011).…”
Section: Introductionmentioning
confidence: 99%