Development of Innovative Integrated Last Planner System (ILPS)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

5
13
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(26 citation statements)
references
References 22 publications
5
13
0
Order By: Relevance
“…2.2.2 Lean tools for planning and control practices. As shown in Table 2, lean tools for planning and control practices suggested by previous studies are last planner system, work structuring and scheduling, location-based management system, benchmarking, 6 sigma, value stream mapping (VSM), daily cluster or huddle meeting, pull scheduling/planning, error proofing (Poka-yoke), bottom neck analysis, line balancing, continuous flow, multiprocess handling and FIFO line (Ansah and Sorooshian, 2017;Babalola et al, 2019;Aslam et al, 2020b). Among these tools, last planner system, which is considered as an efficient lean tool for construction planning and control improvement, facilitates the collaborations of SC actors to formulise effective coordination, construction planning and project delivery (Perez and Ghosh, 2018).…”
Section: Prospect Of Lean Practicesmentioning
confidence: 99%
See 2 more Smart Citations
“…2.2.2 Lean tools for planning and control practices. As shown in Table 2, lean tools for planning and control practices suggested by previous studies are last planner system, work structuring and scheduling, location-based management system, benchmarking, 6 sigma, value stream mapping (VSM), daily cluster or huddle meeting, pull scheduling/planning, error proofing (Poka-yoke), bottom neck analysis, line balancing, continuous flow, multiprocess handling and FIFO line (Ansah and Sorooshian, 2017;Babalola et al, 2019;Aslam et al, 2020b). Among these tools, last planner system, which is considered as an efficient lean tool for construction planning and control improvement, facilitates the collaborations of SC actors to formulise effective coordination, construction planning and project delivery (Perez and Ghosh, 2018).…”
Section: Prospect Of Lean Practicesmentioning
confidence: 99%
“…the meeting of all construction workers with the project manager to discuss relevant issues; thus, it enhances the communication between relevant actors (Aslam et al, 2020b). 2.2.3 Lean tools for construction and site management practices.…”
Section: Prospect Of Lean Practicesmentioning
confidence: 99%
See 1 more Smart Citation
“…After master plan of the project we prepare the Phase Scheduling of the project. It involves the division of the master plan into separate phases of the comprehensive development plan and sets out priorities that can be considered goals by the project team [14]. Phase planning covers the gap between master plan and look-ahead planning.…”
Section: Preparation Of Phase Schedulingmentioning
confidence: 99%
“…Lean construction is an organizational method designed to reduce waste, maintain flow, decrease cost, enhance quality and safety on construction projects (Aslam et al, 2020a;2020b;Innella et al, 2019;Ghanadiof, 2017;Srinivasan et al, 2016;Lee et al, 2019). One practical solution to minimize death and injuries at construction workplaces is applying lean techniques such as the 5S system.…”
Section: Introductionmentioning
confidence: 99%