2020
DOI: 10.3390/app10248917
|View full text |Cite
|
Sign up to set email alerts
|

Development of Cost and Schedule Data Integration Algorithm Based on Big Data Technology

Abstract: In the information age, the role of data in any industry is getting more and more important. In the construction industry, however, experts’ experience and intuition are still key determinants in decision-making, while other industries achieve tangible improvement in paradigm shifts by adopting cutting-edge information technology. Cost and schedule controls, which are closely connected, are decisive in the success of construction project execution. While a vast body of research has developed methodologies for … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(8 citation statements)
references
References 19 publications
(24 reference statements)
0
7
0
Order By: Relevance
“…In this study, the influence of BD on the costs of managing construction projects was pointed out [17]. Another study addressed designing a data processing algorithm for integrated cost management with cost scheduling using big data technology [4]. There are also a few survey studies in the field of big data in construction [19].…”
Section: Literature Reviewmentioning
confidence: 99%
See 4 more Smart Citations
“…In this study, the influence of BD on the costs of managing construction projects was pointed out [17]. Another study addressed designing a data processing algorithm for integrated cost management with cost scheduling using big data technology [4]. There are also a few survey studies in the field of big data in construction [19].…”
Section: Literature Reviewmentioning
confidence: 99%
“…These are based on previous studies' claims that big data in SCM impacts the performance of construction projects [20]. Some also specified key performance indicators such as time and cost [4,6,20,21]. When analyzing the impacts in supply chain management, it is necessary to distinguish between construction time and materials delivery time.…”
Section: Research Hypotheses and Aimmentioning
confidence: 99%
See 3 more Smart Citations