2007
DOI: 10.1016/j.rcim.2005.09.001
|View full text |Cite
|
Sign up to set email alerts
|

Development of an agent-based Virtual CIM architecture for small to medium manufacturers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
20
0

Year Published

2007
2007
2020
2020

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 49 publications
(20 citation statements)
references
References 20 publications
0
20
0
Order By: Relevance
“…The other type of holon in the architecture is holons for scheduling functions in a manufacturing system. Wang et al [13], Nagalingam et al [12] and Zhou et al [20] proposed an agent based approach to develop an architectural solution for CIM systems. In this solution, the agents are classified into three levels: (a) Customer Agents (CA), (b) Facilitator Agents (FA), and (c) Resource Agents (RA).…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…The other type of holon in the architecture is holons for scheduling functions in a manufacturing system. Wang et al [13], Nagalingam et al [12] and Zhou et al [20] proposed an agent based approach to develop an architectural solution for CIM systems. In this solution, the agents are classified into three levels: (a) Customer Agents (CA), (b) Facilitator Agents (FA), and (c) Resource Agents (RA).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The CIM solutions has resulted incredible revolutions and enhancements in manufacturing and production systems. [11][12][13][14][15][16]. There are many researches emphasizing [16][17][18][19][20] on the application of CIM based solutions for realization of integrated manufacturing systems [20][21][22].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…After that, the facilitator agent chooses some suitable resource agents for producing the decomposed components of the requested product and also chooses an assembly agent for assembling the product. In addition, the resource agent will ship the finished components as well as product to the required destinations to fulfil the product order Wang et al , 2007Wang et al , 2005Nagalingam et al 2007). …”
Section: Literature Reviewmentioning
confidence: 99%
“…Based on the published works (Wang 2007;Zhou et al 2010;Wang et al 2007;Nagalingam et al 2007;Wang et al 2003aWang et al , b, 2004aZhou et al 2007Zhou et al , 2010Zhou et al , 2011, assembly scheduling problem in VCIM systems is modeled herein as follows.…”
Section: Problem Statementmentioning
confidence: 99%